RE: 2016 ALTA/NSPS Standards - Table A
No one is under any illusions about this. If we are hired by a client to perform a topo for engineering design, they want and need utilities also, so ...
9 years ago
Forum
RE: 2016 ALTA/NSPS Standards - Table A
All Table A items are clearly negotiable. 2011 Table A item 11b clearly required the same negotiation since it did not even indicate who was responsib...
9 years ago
Forum
RE: 2016 ALTA/NSPS Standards - Table A
If you make the second and third bullets optional, you are left with exactly what is required in Section 5.E.iv. - observed evidence of utilities (whi...
9 years ago
Forum
RE: 2016 ALTA/NSPS Standards - Table A
Adam, post: 354751, member: 8900 wrote: Hgman, does your locator cover the foothills area? All Table A items are negotiable and can be qualified. Wi...