AI Assistant
Activity
 
Notifications
Clear all
beuckie
beuckie
@beuckie
Member
Joined: August 3, 2011 11:19 pm
Last seen: June 3, 2026 7:34 am
Topics: 60 / Replies: 289
Reply
RE: Measuring power line sags.

@chris-mills that's right. I've given details of the time, temp on the ground (no one in the masts) , clouds and humidity at the time of scanning to ...

7 years ago
Reply
RE: Interior layout instrument

Thanks for all the replies. Reflectorless isn't an option as the laser light beam is not a perfect circle and the exact angle point isn't the middle o...

7 years ago
Topic
7 years ago
Replies: 5
Views: 501
Reply
RE: Measuring power line sags.

I measure these powerlines sometimes with TLS. The pic below is 4 scans from a reigl vz400i. 10 minutes on site. It was to measure the distance betwee...

7 years ago
Reply
RE: Time wasters

@jt50 i also get these sometimes, people are crazy!  

7 years ago
Reply
RE: Need help choosing a robotic total station

@hooks i don't need a new one soon, besides staking out and measuring the odd obsolete hidden corner point everything is done with a scanner. And no,...

7 years ago
Reply
RE: "Not For Construction" Plans - Stake 'em or no?

@john-putnam construction staking is mostly with half day tarifs. Calculation before and plans what has been staked are on an hourly rate. Sometimes...

7 years ago
Reply
RE: Need help choosing a robotic total station

@hooks if you like to keep paying for the leica marketing machine, be my guest. A company where you have to pay seperate for functionality on a dc (r...

7 years ago
Reply
RE: "Not For Construction" Plans - Stake 'em or no?

@bill93 it is the clients (or his architect, stability engineer,...) responsibility that the plans that are transferred are correct. we often find er...

7 years ago
Reply
RE: "Not For Construction" Plans - Stake 'em or no?

I stake from plans i receive from my client and mention the e-mail and filenames on my plan i handout to my client. If i were to wait for signed plans...

7 years ago
Reply
RE: Need help choosing a robotic total station

Which headaches? I work with Sokkia for more than 7 years and have had no problems at all on construction sites.?ÿ

7 years ago
Reply
RE: Need help choosing a robotic total station

@hooks two (no three) words : Sokkia or Topcon

7 years ago
Reply
RE: Letƒ??s go Metric they said, Itƒ??ll be fun they said...

i'm glad i was born in the metric system ?????ÿ Bloody English, imperial, driving on the wrong side of the road,... ?????ÿ

7 years ago
Topic
Replies: 12
Views: 723
Reply
RE: Multiple layered dxf files and staking out

that is almost all the time over here. The word xref into a surveyors plan is non existence. We have to check for ourselfs and discuss our findings wi...

7 years ago
Reply
RE: Multiple layered dxf files and staking out

I use a template dwg and xref the drawing in my template. Then i ncopy the necessary data to my template and ditch the xref. When everything is staked...

7 years ago
Reply
RE: New truck blues

i started with a second-hand one and drove it till it fell apart. I thought of another second-hand one but wanted to be sure the bloddy thing starts i...

7 years ago
Reply
RE: Oldest recommended GPS system?

i have one for 7 years now and it still works great. It's heavy but does the job, only no Galileo but i use it in open spaces with good reception. Eve...

7 years ago
Topic
Replies: 1
Views: 616
Reply
RE: Bloody Contractors

it needed to be done anyway but i would rather spend my sunday evening with my kids instead of a dirty construction site

7 years ago
Page 8 / 18