-
Carlson SurvPC7: How to set up a new job with a combined factor
For Carlson SurvPC7, I’d like to load coordinates for an existing job. For the existing job, lets say the horizontal distances between coordinate values are scaled by a multiplier of .99987645321
When I set the job up though, there does not seem to be an option to add a multiplier. The .rw5 defaults to 1.000000
I thought that creating a custom Projection with the combined factor would do the trick. When I do so, I enter the parameters, hit the green check mark, and nothing seems to happen. The .rw5 updates to show the name of the custom projection, but it still shows 1.0000000.
I get the same results using the Localization/TS/Use Ground to Grid/Manual Entry; no updated .rw5 value
Is anyone able to help me figure out what step I may be missing or not understanding? And, should the .rw5 be updating like I expect it to be?
Log in to reply.