-
Trimble Access, how to assign elevation to previous shots
I setup instrument on point “A”, enter height, do the setup, start topo shots with rod height, then at the end I forget to take a shot to my BM. I move to point “B” which of course has no elevation, then do the setup with backsight as “A”, Now i take a shot to BM and all my points from now on have elevations, INCLUDING point “A”, is there anyway to manipulate the job file ( on the data collector, or later on PC) so that all the previous shots taken from Station “A” get their elevations based on BM?
Sorry, there were no replies found.
Log in to reply.