measuring and calculating control points along a Road
Hello guys,
I am doing a topographic survey along 10km road. the client asked to have a control point each 2km. that make in total 6 points. the road is a straight line south-west to north-east. I have 3 R8 receivers, what do you think would be the best way to measure these points?
to put one receiver at the beginning and one at the end and to travel with the third between the points? or to link between all the points like a chain, meaning to put one receiver at the first point and one at the second point and then to move the first receiver to the third point and go on.
another thing, should I trust the heights that I recieve from the network adjustment? or should I make levelling between all the points using a level.
knowing that the job is in an african country where there is no national geoid model and I will be using EGM96.thanks in advance